Revised on 25-07-2023 Latest Rates for Plastering Labour work in Bangalore Slno DETAILS Rate Unit 1 Internal Ceiling Plastering With Lime Rendering or Gare chakka Finish 15.00 Sft 2 Internal Plastering With Lime Rendering or Gare chakka Finish 15.00 Sft 3 External Sponge Plastering Excluding Scaffolding 22.00 Sft 4 External…
How to Build a house step by step.
Part-1 1.1 Dismantling of Existing building 1.2 Site cleaning work Part-2 2.1 Getting the Necessary Permits a) Land survey: Survey of the land has to be carried out with the help of authorized land surveyor b) Soil test report of the land. c) Land documents. d) Architecture/ elevation/ sectional drawings.…